KAIST stadium remodeled
KAIST stadium was reopened on last Thursday, September 14 after its 1.2 billion won-paid remodeling, which equipped the stadium with international standard soccer field, urethane running track, and inline skating track.
■ Main facilities
- Urethane running track
(straight track: 6 lanes, 100 meter-long/ corner track: 4 lanes, 400 meter-long)
- Inline skating track (Width: 4.9m)
- International standard artificial turf soccer field (drainage plate method employed)
- Four night light towers
- Total 1,530 seats installed in the stand
- Shower booths and modern-style toilets
■ Total construction cost: 1.2 billion won
- 0.3 billion won from Seoul Olympic Sports Promotion Foundation (assistance fund),
- 0.9 billion won from KAIST budget
■ Features
- Day/night, all weather, and full-season available
- Artificial turf soccer field employing drainage plate method will reduce about 290 million won from the budget.
< President Kwang Hyung Lee, Booyoung Group Chairman Joong Keun Lee, and executives > KAIST held a completion and donation ceremony for the newly remodeled Pajeongsa and Sojeongsa dormitories at the Seoul Campus on the 18th. The event was attended by key figures including President Kwang Hyung Lee, Booyoung Group Chairman Joong Keun Lee, and students. Booyoung Group is a company that has consistently engaged in various social contribution activities, including housing rental, constru
2025-09-18Due to the increase in average age, studies on changes in the brain following general aging process without serious brain diseases have also become an issue that requires in-depth studies. Regarding aging research, as aging progresses, ‘sugar’ accumulates in the body, and the accumulated sugar becomes a causative agent for various diseases such as aging-related inflammation and vascular disease. In the end, “surplus” sugar molecules attach to various proteins in the body
2023-03-15